Skip to content
This repository was archived by the owner on Jul 26, 2020. It is now read-only.
Permalink

Comparing changes

Choose two branches to see what’s changed or to start a new pull request. If you need to, you can also or learn more about diff comparisons.

Open a pull request

Create a new pull request by comparing changes across two branches. If you need to, you can also . Learn more about diff comparisons here.
base repository: colmena/colmena
Failed to load repositories. Confirm that selected base ref is valid, then try again.
Loading
base: master
Choose a base ref
...
head repository: yshing/loopback-angular-admin
Failed to load repositories. Confirm that selected head ref is valid, then try again.
Loading
compare: master
Choose a head ref
Checking mergeability… Don’t worry, you can still create the pull request.
  • 6 commits
  • 43 files changed
  • 1 contributor

Commits on Aug 7, 2015

  1. Upgrade angular-formly to 6.23.0

    Upgrade angular
    Fix issue event module date time inconsistent.
    yshing committed Aug 7, 2015
    Configuration menu
    Copy the full SHA
    2cb122f View commit details
    Browse the repository at this point in the history

Commits on Aug 8, 2015

  1. Upgrade AdminLTE module

    Upgrade Bootstrap to 3.3.4
    yshing committed Aug 8, 2015
    Configuration menu
    Copy the full SHA
    b24750c View commit details
    Browse the repository at this point in the history
  2. Add AdminLTE required skin

    yshing committed Aug 8, 2015
    Configuration menu
    Copy the full SHA
    22df4a3 View commit details
    Browse the repository at this point in the history
  3. Merge branch 'hotfix'

    yshing committed Aug 8, 2015
    Configuration menu
    Copy the full SHA
    a7a286e View commit details
    Browse the repository at this point in the history

Commits on Aug 14, 2015

  1. Update ClientApp .

    yshing committed Aug 14, 2015
    Configuration menu
    Copy the full SHA
    7a0a66e View commit details
    Browse the repository at this point in the history
  2. Merge commit 'f5693772eaf9b6cf043d1625df4cce0b7ce3bb03'

    Conflicts:
    	bower.json
    	client/app/modules/products/controllers/products.ctrl.js
    	client/app/modules/products/views/form.html
    yshing committed Aug 14, 2015
    Configuration menu
    Copy the full SHA
    d57f198 View commit details
    Browse the repository at this point in the history
Loading